Who this service is for
This page is for companies, contractors and service providers that run accommodation for workers or staff in the Eastern Province, especially in Jubail, Dammam, Khobar and Al Ahsa. Typical situations:
- A labor accommodation lease ends and the crew moves to another building.
- A project starts at a new site and part of the workforce and its furniture moves there.
- Several small housing units are consolidated into one larger building, or split up.
- Company-owned staff apartments (bachelor or family) need their furniture moved.
If you are moving an administrative office instead, see office movers in Jubail or office movers in Dammam.
What makes labor housing moves different
The furniture is repetitive and high in quantity: steel or wooden bunk beds, metal lockers, mattresses, dining tables and chairs, fridges and washing machines, and sometimes shared kitchen equipment. The challenge is not one valuable piece but volume and organization:
- Labeling: furniture is labeled by building and room so it can be laid out the same way, or according to the new floor plan.
- Dismantling: bunk beds and metal lockers are usually taken apart to save truck space, with bolts bagged and numbered.
- Mattresses: covered to keep them clean and dust-free during transport.
- Phases: large quantities are moved in batches so nobody is left without a bed on moving night.
Working around the shift schedule
What matters most to companies is that site work is not disrupted. We usually suggest that workers carry their personal belongings themselves, that we start on the furniture after they leave for work, and that the new accommodation is ready when they return. With day and night shifts, we plan batches around each shift.
Important: if the accommodation is inside a site that requires entry permits or safety requirements, the client arranges the permits and tells us the requirements before the date, and we follow them on site.
Within a city or between cities
We move labor accommodation within Jubail, Dammam, Khobar or Al Ahsa, between Eastern Province cities, and from the Eastern Province to any city in Saudi Arabia when a project or team relocates. For intercity moves see intercity movers; for moves within Jubail see local movers in Jubail.
What we do not do
We move, dismantle and reassemble furniture and appliances. We do not remove or install AC units, and we do not do plumbing, electrical work or cleaning. We also do not use external hoists. If the new building needs any of that work, it is best arranged with specialists before the move date.
Information we need to quote
- Current and new address, building type, floors and lifts.
- Approximate number of rooms, beds, lockers and mattresses.
- Appliances: fridges, washing machines, cookers, shared kitchen items.
- Full dismantling and reassembly, or transport only.
- Required date and whether the move can be done in phases.
The cost depends on quantity, distance, floors, number of phases and assembly. See our moving cost guide, and if there is a gap between the two buildings we can arrange temporary storage.
Who decides what on moving day
Large accommodation moves go wrong less often because of heavy lifting than because of unanswered questions. A bunk bed is found in a room that was not on the list, a block is unexpectedly locked, or a manager wants the third-floor rooms done before the second. To keep decisions flowing, name one person on your side with authority to answer on the spot, give them the room plan, and make sure the crew knows how to reach them. One clear voice beats a group chat of opinions.
Handling a change in headcount or scope
Camps are living places. Between the survey and the move, a crew may be reassigned, a block may be vacated early or extra furniture may turn up in a store. Tell us as soon as the numbers shift, ideally with an updated list. A change reported the day before can usually be absorbed into the plan. A change discovered halfway through loading means the order of work, and sometimes the schedule, must be redrawn while workers wait.
Moving in a sensible sequence
With many rooms, think in blocks rather than in single items. Clear one floor or one building completely, move it, reassemble it and sign it off before turning to the next. This way, a group of workers can return from their shift to a room that is complete rather than one with half its beds. The same thinking is behind moving in two stages, which is worth reading if the old and new buildings overlap in time.
Gates, parking and truck space
Camps and staff compounds often have a gate procedure, a visitor list or restricted vehicle routes. Ask your security team how crews and trucks are admitted, who has to be on the list and where a loaded truck may wait without blocking an exit or a service road. Keep stairwells and fire routes clear while work is under way. Giving the crew a clear loading point close to the building saves more time than adding people.
Worn-out furniture: move it, replace it or leave it
A move is a natural moment to ask whether every item deserves a place in the new accommodation. A bunk bed with a loose frame, a locker with a broken door or a mattress that is stained beyond use costs space in the truck and labour at both ends. Decide before the survey which items go, which are replaced and which stay behind, so the count we plan from is the one that really moves. The moving inventory list is a handy way to keep that record.
Leaving the old building in good order
When the last bed is gone, walk each room with your site contact looking for forgotten items, stray fittings and anything the landlord may question. Take dated photos and keep the key tags together. The steps in handing back your apartment after moving apply just as well to a staff building.
Get a quote for a labor housing move
Send both addresses and the approximate number of rooms, beds and appliances, and we will send a written quote and schedule.
