Scope of this page: the sequence of a moving day inside a city for an average flat or house. For moves between cities read moving across Saudi Arabia, and for preparation before the day the moving preparation checklist.
Why we show a schedule
Much of the worry on moving day comes from not knowing what happens next. Once you know a short walk-through comes after arrival, then wrapping, then loading, you stop asking yourself every half hour whether the crew is late. The schedule below is a model, not a promise, because the length of each stage changes with the rooms, floors, wrapping, distance and the state of the road.
The stages from morning to evening
Before arrival
We contact you before arriving to confirm the address, entrance and parking, and ask for the door to be open and the lift available if there is one. Any coordination with neighbours or building management should have been done the day before, as explained in coordinating your move with building management and neighbours.
Walk-through and packing
We walk the rooms with you to agree what is dismantled, what is wrapped and what is not moving, then wrap fragile items and take apart beds and large wardrobes. This stage runs long if boxes are not ready, so the minutes shrink when your belongings are prepared before the date.
Loading and the road
We load the heavy items first and secure the load, then drive to the destination. We reckon the drive time by the time of day, since traffic is not something we control.
Unloading and assembly
We unload into the rooms you designate, reassemble what we took apart, and then walk the rooms with you before leaving.
Quick table: the stage and your part
| Stage | What the crew does | Your part |
|---|---|---|
| Arrival and walk-through | Agrees the details with you | Be present and answer questions |
| Packing and dismantling | Wraps and dismantles in order | Set valuables and documents aside |
| Loading | Carries and secures | Leave the passages clear |
| The road | Drives to the destination | Reach the destination before or with the crew |
| Unloading and assembly | Unloads and reassembles | Direct the placement and check the items |
What causes delays
The most common causes of delay: boxes not ready, a lift not booked, a street where the truck cannot stand, a large piece missing from the quote, or a last-minute change of destination. To avoid them read common moving mistakes and prepare a moving inventory list before the date.
Keep a first bag with you with documents, medicines and chargers and do not leave it on the truck. See the first-night essentials box.
How you help us steady the day
The more exact your details, the closer our estimate. Send the home type, rooms, floors, lift and destination, plus photos of the rooms. To judge the crew size read how many movers you need.
Quick, accurate quote
Tell us the home type and room count, the floor and lift, the destination and your preferred date.
